The Cheadle branch of John Lewis had an aged fire system. As a result, the reliability of the equipment was becoming a major concern and the fire alarm kept going off at random times, causing a nuisance.
John Lewis is world-renowned as a brand of high-end department stores operating throughout Great Britain, the Republic of Ireland and Australia.
Pure Power Ltd was contracted to provide full testing and maintenance of the system and equipment.
Full fire cover had to be maintained throughout works to ensure the site could continue to operate and no disruption would be caused.
Within four days the entire sprinkler pump system was replaced with modern LPCB-listed sets. They were commissioned and handed over without any issues.
The client was extremely pleased with the speed, attention to detail and good housekeeping throughout the project.